Albright Road

(Butterfield Coach Road to Hylton Road)

Alrbight Overall Exhibit

Updates:

Status: Design Phase

Description: This project consists of constructing 0.5 miles of Albright Road between Hylton and Butterfield Coach. Improvements include a 3 lane roadway with a 8 foot sidepath on both sides and a roundabout at Butterfield Coach.

Estimated Date of Completion: Design is expected to be complete January 2025.

Projected Estimated Cost: TBD